315 E John in Champaign, IL, is a testament to modern architectural design and functionality, featuring 53 residential units across six floors, each equipped with superior plumbing systems. This project not only enhances the living experience for its residents but also contributes to the aesthetic and functional growth of the surrounding urban area.
Integrating a comprehensive plumbing system into the new construction of 315 E John involved careful coordination with other construction processes to ensure timely and efficient installation. Our team navigated these challenges by implementing innovative strategies that accommodated the building’s unique architectural features and maximized space utilization, all while adhering to strict building codes and environmental standards.
We laid the foundational plumbing systems underground, ensuring a robust and reliable network to support the entire building’s water and drainage needs. We expertly handled the rough-in plumbing, installing and connecting the pipes and fixtures within the walls and floors before the final finishes were applied. Finally, we installed fixtures such as sinks, toilets, and faucets, ensuring each unit was ready for occupancy with fully operational plumbing.